Anmut Sur Moi BIOGAS — ZAMBIA
BIOGAS INFRASTRUCTURE — ZAMBIA

Waste in. Clean energy out.

We design, build and maintain biodigesters that turn animal dung and food waste into steady cooking gas and organic fertiliser — for homes, farms and institutions across Zambia.

REQUEST A SITE VISIT→
DESIGN — BUILD — MAINTAIN

Engineered on site. Built to last.

Fixed-dome and balloon digesters sized to your waste and your site — excavated, built and commissioned by our own field crews, from the first brick to the kitchen line.

WHAT WE BUILD→
BIO-SLURRY — ORGANIC FERTILISER

The gas is only half the harvest.

Every digester also returns bio-slurry — a nutrient-rich organic fertiliser that feeds crops, pasture and gardens long after the stove is lit.

SEE THE FULL LOOP→
01 / 03
ANMUT SUR MOI LTD — CLEAN ENERGY: IMPROVED LIVELIHOOD
01 THE FUEL PROBLEM

Most kitchens here still run on charcoal and firewood — bought daily, burned once.

Meanwhile the same households and farms throw away the one fuel they already own: organic waste. Cattle and pig dung, poultry droppings, food and market waste — fed into a sealed digester, it becomes gas that lights first time, every day.

No smoke. No charcoal run. And what comes out the other end goes straight back to the field.

02 ANAEROBIC DIGESTION

One sealed loop.

Inside the digester, bacteria break down organic matter without oxygen. The gas rises off to your stove; what's left is a rich, ready-to-use slurry for the garden or field.

STAGE 01 — FEED

Organic waste

Cattle and pig dung, poultry droppings, food and market waste — the inputs you already have on site.

STAGE 02 — CAPTURE

Biogas

The digester captures methane-rich gas and pipes it straight to a clean-burning stove — no smoke, no charcoal.

STAGE 03 — RETURN

Bio-slurry

What comes out is a nutrient-rich organic fertiliser — feed it back to crops and pasture to close the loop.

03 TWO PROVEN SYSTEMS

We match the digester to your site, herd size and budget.

Crew laying the brick dome of a fixed-dome biodigester
SYSTEM N°01

Fixed-dome
digesters

Brick-and-mortar domes built into the ground — durable, permanent installations sized for farms and institutions with steady, high-volume feedstock.

STRUCTUREBRICK & MORTAR, BELOW GRADE
SERVICE LIFELONG — BUILT ON SITE
OUTPUTHIGH — LARGER LOADS
SUITED TODAIRY / PIGGERY / POULTRY
SYSTEM N°02

Balloon (bag)
digesters

Flexible tubular digesters that install fast at lower cost — a practical entry point for households and smallholders moving off firewood and charcoal.

STRUCTUREFLEXIBLE MEMBRANE, SURFACE
INSTALLFAST — LOWER UPFRONT COST
SCALEADD UNITS AS YOU GROW
SUITED TOHOMES / SMALL FARMS
Large balloon digester installed on a prepared pad
04 HOW WE WORK

From first visit to a working stove.

Every job starts with a real look at your site. We size the system to your waste and your needs, build it, and stay on to make sure it keeps running.

FULL SERVICE LIST→
01

Site assessment

We visit, measure your feedstock and space, and tell you honestly what will work.

02

System design & quote

Following a site assessment visit, a digester sized to your daily waste, with a clear cost and expected gas output, will be designed.

03

Construction & installation

Our field crews will build and connect the system, from excavation to point of use.

04

Commissioning

We do a full check of the entire build before handing it over to you:

  • —Digester tank for leaks and seals
  • —Gas piping, valves and safety devices
  • —Slurry inlet and outlet chambers

Once commissioned, your system is ready to use.

05

Training

We show you how to feed, run and get the most from your system:

  • —You get a commissioning warranty certificate and user manual
  • —Our team confirms expected gas output vs. your daily waste
06

Maintenance

We stay reachable for servicing and repairs, so the gas keeps flowing for years.

05 WHO WE WORK WITH
A Households Clean cooking without charcoal or smoke → B Farms & agribusiness Turn dairy, piggery & poultry waste into fuel → C Institutions Schools, lodges & barracks that cook at scale → D NGOs & government Clean-energy programmes & rollouts →
06 FIELD RECORD

In the field, across Zambia.

MEET THE TEAM→
Fixed-dome digester curing on site
FIG.01 — FIXED-DOME, CURING
Fixed-dome digester with brick inlet and outlet chambers
FIG.02 — DOME & INSPECTION CHAMBERS
Excavator preparing digester foundations on site
FIG.03 — EARTHWORKS ON SITE
Field crew and trainees around a digester under construction
FIG.04 — CREW & TRAINEES ON SITE
Crew building the shell of a fixed-dome digester
FIG.05 — DOME SHELL, INTERIOR
Row of balloon biodigesters installed at a farm
FIG.06 — BALLOON DIGESTER ARRAY
DRAG OR SCROLL —
07 FROM THE FIELD

Latest news & project updates.

ALL NEWS→
SEP 2026 · INTERNATIONAL PROJECT

From Zambia to Uganda: BTZ Completes First International Biodigester Project

Biogas Technology Zambia (BTZ) has completed its first international commercial project in Jinja, Uganda. A 200m³ biodigester was installed at Yalelo Uganda between Nov 2025 – Jan 2026 to process 1,000–3,000kg of fish mortalities daily. The plant now produces 100–120m³ of biogas per day, which fully meets cooking and water heating needs for 1,200 workers, and 110–135 tonnes of organic fertilizer.

READ MORE →
Newly
SEP 2026 · STAFF DEVELOPMENT

Building the Next Generation of Zambia’s Bioenergy Workforce

Biogas Technology Zambia (BTZ) is investing in young professionals as it rolls out a 3.5-year programme to install 2,000 biodigesters across Zambia. To meet the growing demand, BTZ is recruiting and developing talent beyond engineering, including in Biofuels, Business, Marketing, and Project Support. As part of this, 5 interns have been engaged for 6 months to gain practical ex

READ MORE →
AUG 2026 · PROJECTS

A village biogas project tests Zambia’s push to improve rural energy access

A biogas project in Zambia’s Nkhundye village is turning cattle dung into energy for cooking, irrigation, and meeting limited electricity needs. The system was serving about 100 households as of March this year, with plans to expand cooking gas access to 600 community households using underground pipes and portable gas bags. Nonprofits and development agencies bore the initial costs of installing

READ MORE →
Biogas classroom training with Zambia Army personnel
JUN 2026 · TRAINING

Biogas training for the Zambia Army

A hands-on course for Defence Force personnel — classroom theory, then field assembly, feeding and commissioning of live digesters.

READ MORE →
08 START HERE

Ready to stop buying charcoal?

Tell us about your site and how much you cook. We'll come out, take a look, and recommend the right system — no obligation.

0978 933 393